Draft report says:
- The EIA project consultant, Shiva Test House, says project land is barren
- Dwells on the population within a 10 km radius to hide the population density near the site
- Shows Roksa village at 3 km distance from site; mentions a river Baya
- Project will draw 300 cubic metre groundwater daily but does not show what impact it will have on people
Ground reality:
- The site and its adjoining farms grow mangoes, lychees, wheat, rice, seasonal vegetables and mustard
- The site is surrounded by eight schools and eight villages with populations ranging from 8,000 to 20,000.
- Roksa is 600-700 metres from the site; there is no river Baya in the area
- No surveys conducted for preparing baseline data