Thursday, March 12, 2009

SEAC minutes- Excerpt on Finolex TPP at Ranpar, Ratnagiri

Minutes of the 8th meeting of the State Level Expert Appraisal Committee (SEAC)
Date : 7th March, 2009
Present
1. Shri P.M.A. Hakeem - Chairman
2. Shri GK Deshpande - Member
3. Dr. Kishore Bhoir - Member
4. Dr. SB Chapekar - Member
5. Dr V.R. Gunale - Member
6. Dr. SK Padole - Member
7. Dr. TG More - Member
8. Shri GN Warade - Member-Secretary
S.No. in the agenda

Name and addresss of the project proponent with brief details of the project: Finolex Industries Ltd.43 MW Thermal Power Project (Captive) at Ranpar, Ratnagiri ENV-08/C.R 175/C.R1
Category: B-2
Decision of the Committee:
Before the presentation was made by the project proponent, two representatives of Pawas Golap Dashahkroshi Janhit Samiti who wanted to make representation against the project were heard. They pointed out that there would be adverse impact on the environment of the district, particularly on mango trees and fisheries, if various proposed power projects (including the proposed captive power plant) to the tune of many thousands of MW are installed. They also stated that till various studies on the environmental impact of all such projects are carried out, approval to the project should be held up. The project proponent then made a detailed presentation on the need to set up the power project, as the steady power availability to their PVC project has become uncertain and the various proposed measures to substantially reduce the environmental impact of the project. They explained the various measures proposed to be taken to allay the fears of the people who have raised objection to the project and confirmed that the various measures promised to be taken by them in the public hearing would be implemented. After discussion, it was decided to recommend grant of prior environmental clearance to the project subject to the project
proponent complying/furnishing the following:
(i) Boiler capacity, exact quantity of ash to be generated, metal content of ash and physico-chemical characteristics of coal to be indicated.
(ii) Initiate steps to implement the assurances given in the public hearing to determine protocol/modalities to be followed on arrival of ships.
(iii) Indicate the proposed precautions to collect and treat surface drainage from the plot to ensure that water in the adjoining plots is polluted.
(iv) Explore the option of waste heat recovery.
(v) Details of the arrangement for the complete utilization of fly ash.
(vi) Explore the possiblility of providing flue gas desulphurisation considering the emission of sulphur dioxide or hydrogen sulphide in the exhaust.